Download Print this page

ParaBody 93 Assembly And Instruction Sheet page 6

Bodysmith prosystem main unit

Advertisement

093
17.
18.
19.
20.
21.
22.
NOTE:
23.
NOTE:
BODYSI~tTU
PROSYSTEM ASSEMBLY INSTRUCTIONS
Attach one (1.) 3/4 X 2 IN. PAP,.AGLIDE St'RIP and one (I) 1-1/2 X2 IN. PARAGLIDE
STRIP to
ADJUSTABLE KNEE SUPPORT as shown in ('DETAIL E) using the following
steps:
A.
Thoroughly ciean all surfaces where the PARAGLIDE
STRIPS are to be attached.
B.
Remove the paper backing from the PARAGLIDE STRIPS and firmly apply them to the shown
surfaces.
Assemble two (2) ROLLER PADS to the ADJUSTABLE KNEE SUPPORT, using one (I)
ROLLER
PAD SHAr'-I',
and two (2) STAR LOCK COLLARS.
Insert
one (I) 2 IN. SQ. END CAP into the front
end of the ADJUSTABLE KNEE SUPPORT.
To use the ADJUSTABLE KNEE SUPPORT, rum the KNEE SUPPORT TUBE so that
the ROLLER
PADS are vertical, tnse~ the pin into the desired hole, and rotate clockwise until locked. (SEE
DtL, kWlNG)
Attach eight (8) I-1D- X 2 PARAGLIDE STRIPS to the BAR HOLDERS, and SAFETY RAILS
shown in (DETAIL F) using the following steps:
A.
Thoroughly clean all surfaces where the PARAGLIDE
STRIPS are to be attached.
Remove the paper backing from the PARAGLIDE STRIPS and fLrmly apply them to all shown
surfaces.
To use the BAR HOLDEP~, and SAFETY RAILS follow the same procedure as in ~TEP 20.
BEFORE PROCEEDING WITH CABLE INSTALLATION,
UNRAVEL CABLE, AND REMOVE
AS MUCH SPIRALING AS POSSIBLE.
To install
the PRIMARY CABLE (PB2827-I), start
by inserting
the end of the CABLE, WITHOV~F the
WI-IITE BALL between
the TOP PULLEY and the LAT BAR HOLDER on the PULLEY MOUNT
FLATS. (REMOVE PULLEY FOR EASE OF INSTALLATION)
Pull CABLE over TOP PULLEY until
the WHITE BALL stops against
the PULLEY and the LAT BAR
HOLDER.
Pull
CABLE over and down the SECOND PULLEY of the PULLEY MOUNT FLATS. Run the
CABLE around one of the PULLEYS of the PULLEY BLOCK SYSTEM and up to the THIRD
PULLEY of the
PULLEY MOUNT FLATS.
Pull CABLE over and down the THIRD PULLEY, to the WEIGHT CARRIAGE. Attach the CABLE to
the WEIGHT CARRIAGE, using one (I)
5/16 IN. SNAP HOOK. (SEE DETAIL C)
See CABLE ROUTING DIAGRAM (DETAIL A) for help in completing
STEP 23.
IF THIS UNIT WILL BE ASSElVIBLED WITH OPTIONAL PEC DEC, STOP HERE AND PdEFER
TO THE PEC DEC ASSEMBLY INSTRUCTIONS. COMPLETE STEPS #2 TH_RU # 1S. WHEN
THIS IS COMPLETED, SKIP STEP #24,AND CONTINUE ON TO STEP #25 OF TIq'E MAIN
UNIT INSTRUCTIONS.

Advertisement

loading