Page 2
Parabody customer service department at (800) 328-9714. Please note: * Thank you for purchasing the Parabody 913101 Weight Stack option. Please read these instructions thoroughly and keep them for future reference. This product must be assembled on a flat, level surface to assure its proper function.
STEP 3: A. Insert the two GUIDE RODS (2) into the base the TOWER as shown in FIGURE 3. Lubricate the GUIDE RODS with a slicon or teflon spray that is available at most hardware stores. B. Slide two WEIGHT STACK CUSHIONS (6) down over the GUIDE RODS (2).
Page 5
TOWER BRACE FIGURE 5 STEP 5: Place TOWER BRACE over the GUIDE RODS (2) and securely using previously remow~d 1/2" X 4" BOLTS, 1/2" WASHERS, AND 1/2" NUTS as shown in FIGURE 5. TOWER BRACE CABLE’ FIGURE 6 STEP 6: Route threaded end of CABLE (part # 6671601) around pulleys in TOP BOOM and PULLEY BLOCK ASSEMBLY.
Page 6
CABLE-, ~,, FIGURE 7 STEP 7: A. Screw the treaded end of the CABLE (part #66716001) approximately 3/4" into the end of the WEIGHT STACK SHAFT (1) and tighten jam nut securely. B. Apply one WEIGHT STACK LABEL (11) to each WEIGHT PLATE (5) as shown. Labels 1 through 20 should be appled from top to bottom of the WEIGHT STACK and close to the key-hole.
Page 7
FIENCH FRAME FIGURE 8 STEP 8: A. Remove the BOLT, WASHERS, and LOCK NUT below the PULLEY in UPRIGHT. See FIGURE 8. B. Insert the threaded end of CABLE (part #6671001) under the PULLEY in UPRIGHT and around the bottom PULLEY of the PULLEY BLOCK. See FIGURE 8. C.
Page 8
PLATE (5) or if there is excess slack in the cable system, adjust the threaded end of the CABLE accordingly and retighten the jam nut. THIS CONCLUDES THE ASSEMBLY OF THE 913101 5/16" SNAP HOOK PIN (4) and perform several repetitions on the machine. This will relax ;116"...