Panasonic CPC-EX Installation Manual page 75

Digital business system section 300 (applies to cpc-aii/b version 9.2 and cpc-ex version 2.3)
Table of Contents

Advertisement

Section 300-Installation
Installing T1 in a Double Cabinet with the T1 in the Slave
1. Install the Sync Unit in the master cabinet as described in Steps 1 and 2
2. Install a T1 MDF card in the slave cabinet. (See Step 3 on page 4-23.)
3. Set Switch 1 on the T1 card. (See Step 4 on page 4-24.)
4. Install a T1 card in the "EC/TRK" slot of the slave cabinet.
5. Connect the Sync Cable from CN1 on the Sync Unit to CN5 on the T1
6. At the slave cabinet, connect the cable attached to CN3 on the T1 MDF
7. Using an RJ48 cable, connect CN1 of the T1 MDF card to the CSU. (See
8. At the slave cabinet, connect the ground cable on the T1 MDF card as
DBS-2.3/9.2-300
under "Installation for a Single T1."
card (Figure 4-11).
Note: Part Number VB-43564 is used for the Sync Cable when a T1 is
installed only in the slave cabinet of a two-cabinet system.
card to CN3 on the T1 card (Figure 4-10).
Figure 4-9 on page 4-25 for RJ48 pinouts.)
shown in Figure 4-10 on page 4-26.
DBS Manual - Revised April 2000
Chapter 4. Trunks and Lines
4-27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vb-43030Vb-43050Vb-43060Dbs 40Dbs 72Dbs 96

Table of Contents