Panasonic CPC-EX Installation Manual page 68

Digital business system section 300 (applies to cpc-aii/b version 9.2 and cpc-ex version 2.3)
Table of Contents

Advertisement

Chapter 4. Trunks and Lines
Installation
The following procedures provide step-by-step instructions for installing the
T1 Interface. The procedure that you should use depends on the type of
system you have and the number of T1s you are installing.
4-20
If you are installing ...
A T1 in a single cabinet
One T1 in a double cabinet, with the
T1 located in the master
One T1 in a double cabinets, with the
T1 located in the slave
T1s in both the master and slave
DBS Manual - Revised April 2000
Section 300-Installation
Use this procedure...
"Installing a T1 in a Single Cabi-
net" (page 4-21)
"Installing a T1 in a Single Cabi-
net" (page 4-21)
"Installing a T1 in a Double Cabi-
net with the T1 in the Slave"
(page 4-27)
"Installing a T1 in a Double Cabi-
net with T1s in the Master and
Slave" (page 4-27)
DBS-2.3/9.2-300

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vb-43030Vb-43050Vb-43060Dbs 40Dbs 72Dbs 96

Table of Contents