Boiler Assembly - Smith SERIES 28RTS/HE Installation & Operating Instructions Manual

Gas or oil water boiler
Table of Contents

Advertisement

SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS
Page 8
f)
After it has been determined that each appliance
remaining connected to the common venting
system properly vents when tested as outlined
above, return doors, windows, exhaust fans,
fireplace dampers and any other gas-burning
appliance to their previous condition of use.
Une fois qu'il a été d éterminé, selon la métode
indiquée cidessus, que chaque appareil raccordé
au système d'évacuation est mis à l'air libre de
façor adéquate. Remettre les portes et les fenêtres,
les ventilateurs, les registres de cheminées et les
appareils au gaz à leur position originale.
g) Any improper operation of the venting system should
be corrected so the installation conforms with the
National Fuel Gas Code, ANSI Z223.1/NFPA 54 or
ANSI/NFPA 31 Installation of Oil Burning Equipment
for oil burners. When resizing any portion of the
common venting system, the common venting
system should be resized to approach the minimum
size as determined using the appropriate tables in
Appendix F in the National Fuel Gas Code, ANSI
Z223.1/NFPA 54 and or CSA B149 Installation
Codes.
Tout mauvais fonctionnement du systéme
d'évacution commun devrait étré corrigé de façor
que l'installation soit conforme au National Fue
Gas Code, ANSI Z223.1/NFPA 54 et (ou) aux
codes d'installation CAN/CGA-B149 or ANSI/NFPA
31 Installation of Oil Burning Equipment for oil
burners. Si la grosseur d'une section du système
d' évacuation doit étré modifi ée, le système devrait
étré modifi é pour respecter les valeurs minimales
des tableaux pertinents de l'appendice F du
National Fuel Gas Code, ANSI Z223.1/NFPA 54 et
(ou) des codes d'installation CSA-B149.

BOILER ASSEMBLY

Locate the boiler installation site based on the guide-
lines set forth in the BOILER LOCATION section.
WARNING: Never install a RTS Series boiler on
top of comustible fl ooring without consulting the
local building authorities for proper installation
guidelines! Failure to comply with this warning
can result in a fi re causing extensive property
damage, severe personal injury or death!
IMPORTANT NOTE!
A minimum distance of 3 ft., 0.9 m, must be main-
tained between the Back Section return port and
adjacent construction behind the boiler to allow for
RTS installation and removal, Figures 1.
Packaged Boilers/Factory Assembled Sections
A careful inspection of all assemblies should be made
to detect possible shipping damage. Packaged boilers
and factor y assembled blocks of sections are
hydrostatically tested at the factory to insure pressure
tightness. A hydrostatic retest should be performed
before any piping connections are made to detect leaks
caused by shipping.
NOTE: All assembled boiler sections shall pass the
hydrostatic tests prescribed in Section IV of the
ASME Boiler and Pressure Vessel Code.
CAUTION: Do not connect any boiler controls during
the pressure test or they will be damaged!

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents