Quadra-Fire 57ST-ACC-B Installation Manual page 17

5700 step top wood stove series
Table of Contents

Advertisement

Figure 17.1
Door latch with the
ash door rod locked
in place
Figure 17.2
Insert two bolts through ARS
Channel, Appliance, Gasket, and
ARS Door Assembly; secure with
two nuts.
Figure 17.3
September 27, 2016
Knob
Ash Door Rod shown
in installed position
Ash Removal
Spacer
Figure 17.4
Ped Kit and Ash Removal System (Cont'd)
Installing Ped Kit
1. Follow Beginning installing the ARS system instructions provided
on page 16.
2. Slide pedestal over adapter on bottom of appliance and secure
with four screws using phillips head screwdriver (Figure 18.1 on
page 18).
3. Install ARS Spacer on left hand side with one bolt using phillips
head screwdriver (Figure 17.4).
4. Carefully stand stove up and place in desired location.
Finishing the ARS Installation
1. Replace front 3 bricks that were removed in step 1 (Figure
18.2).
2. Install the ash drawer to pedestal base.
3. Install ARS access cover inside of ARS Channel that is located
inside the firebox (Figure 18.2).
Caution!
CHECK BAFFLE BOARDS & CERAMIC BLANKET!
Verify that the baffle boards and ceramic blanket are
in their proper locations.
It is important that the baffle boards and ceramic
blanket are correctly installed for proper burn safety.
NOTE: If installing a floor installation of an outside air kit on a Step
Top model with a pedestal assembly you must attach the enclosed
cover plate with 4 screw to the back of the stove. Other wise you
may discard this piece (Figure 18.3).
7038-206F
5700 STEP TOP ACC
17

Advertisement

Table of Contents
loading

Table of Contents