Tools And Equipment Required For Installation - Juniper G10 CMTS Installation Manual

Hide thumbs Also See for G10 CMTS:
Table of Contents

Advertisement

Tools and Equipment Required for Installation

The following tools are needed to install power supplies and modules, and to rack mount the
G10 CMTS chassis:
In addition, the following supplies may be required:
The following equipment is required to configure the G10 CMTS and verify that the RF system
has been setup properly:
M2.5 Phillips torque screwdriver
M2.5 flathead torque screwdriver
M3 Phillips torque screwdriver
1/8 in. Allen wrench, or 1/8 in. hex torque screwdriver
M5 Phillips torque screwdriver
#10 Phillips torque screwdriver
#10 flathead torque screwdriver
#12 Phillips torque screwdriver
7/16 in. torque wrench
22-10 AWG crimper/cutter
RF cables and adapters
Ethernet cables with RJ-45 connectors
PC with asynchronous terminal emulation
RF spectrum analyzer
RF power meter
Tools and Equipment Required for Installation
5

Advertisement

Table of Contents
loading

Table of Contents