Superior PHK30 Installation And Operation Instructions Manual page 8

Table of Contents

Advertisement

Installation must include an equipment shutoff
valve, union and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up.
NPT tap must be upstream from log set (see
Figure 4).
IMPORTANT: Install equipment shutoff valve
in an accessible location. The equipment
shutoff valve is for turning on or shutting off
the gas to the appliance.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could
result in a clogged burner injector.
WARNING: Use pipe joint
sealant that is resistant to liquid
petroleum (LP) gas.
We recommend that you install a sediment
trap (not supplied with log set) in supply line
as shown in Figure 4, page 7. Locate sediment
trap where it is within reach for cleaning. Install
in piping system between fuel supply and ap-
pliance. Locate sediment trap where trapped
matter is not likely to freeze. A sediment trap
captures moisture and contaminants. This
keeps them from going into log set controls.
If sediment trap is not installed or is installed
wrong, log set may not run properly.
CHECKING GAS CONNECTIONS
WARNING: Test all gas piping
and connections, internal and
external to unit, for leaks after
installing or servicing. Correct
all leaks at once.
WARNING: Never use an open
flame to check for a leak. Apply a
noncorrosive leak detection fluid
to all joints. Bubbles forming show
a leak. Correct all leaks at once.
Pressure Testing Gas Supply Piping
System
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect appliance with its appliance
main gas valve (control valve) and equip-
ment shutoff valve from gas supply piping
8
INSTALLATION
Continued
www.SuperiorFireplaces.US.com
system. Pressures in excess of 1/2 psig
3.5 kPa) will damage appliance regulator.
2. Cap off open end of gas pipe where equip-
ment shutoff valve was connected.
3. Pressurize supply piping system by either
using compressed air or opening main gas
valve located on or near gas meter.
4. Check all joints of gas supply piping sys-
tem. Apply noncorrosive leak detection
fluid to gas joints. Bubbles forming show
a leak.
5. Correct all leaks at once.
6. Reconnect log set and equipment shutoff
valve to gas supply. Check reconnected
fittings for leaks.
Test Pressures Equal To or Less Than
Test Pressures Equal To or Less Than
1/2 PSIG (3.5 kPa)
1/2 PSIG (3.5 kPa)
1. Close equipment shutoff valve (see Fig-
1. Close equipment shutoff valve (see Fig-
ure 5).
ure 5).
2. Pressurize supply piping system by either
2. Pressurize supply piping system by either
using compressed air or opening main gas
using compressed air or opening main gas
valve located on or near gas meter.
valve located on or near gas meter.
3. Check all joints from gas meter to equip-
3. Check all joints from gas meter to equip-
ment shutoff valve (see Figure 5). Apply
ment shutoff valve (see Figure 6). Apply
mixture of liquid soap and water to gas
noncorrosive leak detection fluid to gas
joints. Bubbles forming show a leak.
joints. Bubbles forming show a leak.
4. Correct all leaks at once.
4. Correct all leaks at once.
Equipment
Shutoff
Valve
Figure 5 - Equipment Shutoff Valve
Equipment
Shutoff Valve
Figure 6 - Checking Gas Joints
Figure 6 - Checking Gas Joints
HEARTH KIT ASSEMBLY AND
INSTALLATION
Kit Assembly - Ramp Pan Burner
1. Determine which side gas line feeds into
fireplace. This log set is factory set up for
INSTALLATIO
Continued
Installa
1. Plac
2. Thre
3. Insta
4. Atta
Open
Adapter
Fitting
Closed
Equipment
Shutoff
Valve
Gas Meter
Gas Meter
TESTIN
1. Gen
2. Ligh
126903-01A
3. Insp
of fir
face
supp
fittin
adap
kink
to ga
Gas
Tube
Figu
dete
W
gas l
than
sligh
struc
gas
burn

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phk24Phk18

Table of Contents