Installation; Mounting; Water Piping - Trane CGA-SVX01A-EN Installation, Operation And Maintenance Manual

Koolman500 air-cooled cold generator with heat pump option
Table of Contents

Advertisement

Complete the "Installation Checklist" during
installation to verify completion of all
recommended procedures before unit
start-up.
RIGGING
Each unit is bolted to a shipping skid for
shipment to the job site. Move the unit using
a forklift of suitable capacity. See Table 1 for
unit shipping weights.
Locate the unit near a large-capacity drain to
allow system drainage during unit shutdown
and repair. Rig the unit using canvas belt.
Fasten the belt to the unit over the unit's
base as show in Figure 1.
© American Standard Inc. 2001

INSTALLATION

MOUNTING

Mounting methods that will minimize sound
and vibration problems are:
1. Mount the unit directly on an isolated
concrete pad or on isolated concrete
footings at each unit mounting point.
2. Install the optional neoprene or spring
isolators at each mounting location.
Refer to Figure 2 for unit and base
dimensions and Figure 3 for recommended
service clearance.

WATER PIPING

Thoroughly flush all water system piping
before making the final piping connections to
the unit.
4
Table 1 - Unit Shipping Weights
Model
Maximum Shipping Weight (Kg)
030
230
040
250
050
260
075
370
100
450
125
500
150
530
175
550
200
570