Install Blade Control (Pto) Rod; Install Shift Lever; Pto Rod; Hairpin Cotter - Toro 30164 Operator's Manual

Proline 10.5 hp 32" mid-size mower
Table of Contents

Advertisement

Assembly
Install Blade Control (PTO)
Rod
1.
Rotate blade control lever (PTO) away from left
handle so rod drops down.
2.
Secure blade control (PTO) rod through hole in
bellcrank with hairpin cotters (Fig. 8).
Figure 8
1. Blade control lever
2. Blade control rod

Install Shift Lever

1.
Remove the 3/8" locknut and spring disk washer
from the stud on top of the transmission.
Note:
Do not remove rubber seal washer and
square hole washer from transmission
shaft.
2.
Slide shift lever through control panel and align
mounting hole in lever with square on
transmission shaft. Secure lever to transmission
with previously removed spring washer and
locknut (Fig. 9).
16
m–3783
3. Bellcrank

4. Hairpin cotter

3.
Replace the spring washer, dish down, and
locknut (Fig. 8).
4.
Torque nut to 35 ft. lbs. (47 N m).
5.
Shift lever to second gear and check alignment
of lever in slot of shifter plate. Clearance
between top of lever and the top of the slot
should be about equal to the clearance between
bottom of the lever and the bottom of the slot.
6.
If clearance is not correct, remove lever and bend
it slightly to adjust.
Note:
Do not bend lever while attached to
transmission shaft or damage may
occur.
7.
Shift lever to neutral and check alignment of
lever in slot of shifter plate. Clearance between
left and right of slot should be about equal. If not
move control panel to adjust (Fig. 9).
Figure 9

1. Shift lever

2. Control panel
3. Rubber seal washer
m–3772

4. Square hole washer

5. Spring washer

6. Locknut 3/8

Advertisement

Table of Contents
loading

Table of Contents