Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
Note: Determine the left and right sides of the machine
from the normal operating position.
1
Installing the Handle
Parts needed for this procedure:
1
Handle
2
Hex-head-flange bolt (5/16 x 1-1/2 inches)
2
Carriage bolt (5/16 x 1-1/2 inches)
4
Flange nut (5/16 inch)
Procedure
1. Remove the cable guard from the handle
removing the 2 carriage bolts and 2 locknuts that hold
the cable guard to the handle.
Description
Handle
Hex-head-flange bolt (5/16 x 1-1/2
inches)
Carriage bolt (5/16 x 1-1/2 inches)
Flange nut (5/16 inch)
No parts required
No parts required
No parts required
No parts required
(Figure
Qty.
1
2
2
4
–
–
–
–
3) by
1. Cable guard
2. Locknut (2)
3. Carriage bolt—1/4 x 1-1/2
inches (2)
Note: Save the guard, the carriage bolts, and the
locknuts so that you can install it onto the handle later
in this procedure.
8
Use
Install the handle.
Install the recoil-start rope.
Fill the crankcase with oil.
Adjust the self-propel drive.
Assemble the grass bag.
Figure 3
4. Flange nut—5/16 inch (2)
5. Hex-head-flange
bolt—5/16 x 1-1/2 inches
(2)