Transaxle Installation - Toro TimeCutter SW4200 Service Manual

Hide thumbs Also See for TimeCutter SW4200:
Table of Contents

Advertisement

Transaxle Installation

1. Wide Frame Only – If a new hydro assembly is
being installed, transfer the (2) mounting brackets
(C and D) to the new hydro assembly and torque the
fasteners to specification; C - 30 ft-lbs. (40 Nm) and
D - 8 ft-lbs. (14 Nm) (Fig. 071).
D
C
Fig. 071
2. Position the hydro assembly up into the unit frame
and align mounting points.
3. Loosely install all the hydro mounting fasteners and
center support fasteners. Do not fully tighten at this
time.
Toro Timecutter SW/SWX Service Manual
HYDROSTATIC DRIVE SYSTEM
4. Torque fasteners in sequence to specification as
shown:
Wide Frame:
1st - Torque fastener (E) to specification – 17 ft-lbs.
(23 Nm) (Fig. 072)
2nd - Torque fastener (F) to specification – 17 ft-lbs.
(23 Nm) (Fig. 072)
PICT-1105
3rd - Torque fastener (G) to specification – 17 ft-lbs.
(23 Nm) (Fig. 073)
E
F
Fig. 072
G
Fig. 073
PICT-1106
5
PICT-1099
5-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents