Installing The Starter Rope; Installing The Discharge Tunnel Plug - Toro 22190 Operator's Manual

21in heavy-duty recycler/rear bagger lawn mower
Table of Contents

Advertisement

(5/16 x 1-1/4 inches), washers, and thin locknuts
(5/16 inch) (Figure 3).
1. Bag support rod
2. Carriage bolt
3. Bag aligning plate
4. Cap locknuts (3)
5. Handle
6. Bolt, (5/16 x 1-1/2 inches)
(2)
7. Handle latch (2)
2. Secure the handle latches to the handle with 2 bolts
(5/16 x 1-1/2 inches), washers, and locknuts (5/16
inch) (Figure 3).
Note: Install the washers with the cup side facing
the handle.
Note: You can adjust the handle height for
comfortable operation. Stand behind the handle to
determine the height. To adjust the handle height,
position the bolts and the locknuts that secure the
handle latches to the handle into the other mounting
holes in the latches.
3. Insert the carriage bolt through the bag aligning
plate and the second hole from the top on the left
side of the handle, and secure it with a cap locknut
(Figure 3).
4. Slide the bag support rod through the third from the
top mounting holes in the handle, and secure each
end with a cap locknut (Figure 3).
5. Use cable ties to secure the control cables to the
handle (Figure 3).
Figure 3
8. Thin nylon insert locknut
(2)
9. Bottom hole in housing
10. Washer (4)
11. Locknut (2)
12. Bolt, (5/16 x 1-1/4 inches)
(2)
13. Cable tie (3)
2

Installing the Starter Rope

No Parts Required
Procedure
Pull the starter rope through the rope guide on the
handle (Figure 4).
1. Starter rope
Note: To make the rope easier to install, squeeze the
control bar on the handle.
3
Installing the Discharge Tunnel
Plug
Parts needed for this procedure:
1
Discharge tunnel plug
Procedure
1. Open the discharge door by pulling forward on the
handle and moving it rearward (Figure 5). Hold the
discharge door handle to prevent the spring-loaded
door from closing while you insert the plug.
8
Figure 4
2. Rope guide

Advertisement

Table of Contents
loading

Table of Contents