22.
Raise the front hitch so that the snow blower is off the
ground; then stop the tractor engine and engage the parking
brake.
23.
Check to verify that the snow blower pin is fully seated into
the front hole of the 'A' frame. If not, push the pin rearward to
fully engage the 'A' frame.
24.
Lower the blower to the ground then mount the snow blower
drive shaft to the stub shaft by sliding the pulling the locking
collar back and sliding the PTO on to the stub shaft until the
PTO locks.. See Figure 8.
Drive Shaft
Stub Shaft
'A' Frame not show for clarity
figure 8
WARNING! Do not attempt to connect the drive
shaft when the tractor engine is running. Stop the
tractor engine, disengage all PTO controls, en-
gage the parking brake, and wait for all movement
to stop before connecting the snow blower drive
shaft.
Mounting the Chute
NOTE: Grease the chute base before attaching. See Figure 9.
The chute was shipped with two of the chute clamps attached. To
attach the chute, place it onto the chute base and secure it with
the one remaining chute clamp using the clamp, spacer,
carriage screw and
1.00
1/4-20
See Figure 9.
Chute
Hex Lock Nut
Spacer
Clamp
Hex Screw
Mounting the Chute Crank
To mount the chute crank you will need to two 3/8-16 x 3.50 Hex
Screws and two 5/16-18 x .1.00 hex bolts.
1.
Mount the chute crank to the side of the chute base with the
hex screws. See Figure 10.
Hex Screws
Chute Crank
Support Tube
2.
Mount the support tube on the horizontal bracket below the
chute base using the 5/16-18 x 1.00 bolts and flange nuts.
See Figure 10.
11
1/4-20 x
hex lock nut from the screw pack.
Bottom of Chute
Mounting Holes
Chute Base
figure 9
Hex Bolts
figure 10