CONDENSATE DRAIN

There are two condensate drain connections from the
condenser drain pan (compressor area). These are
visible from the rear of the unit. Factory-installed tubing
connects the two drains at a tee connection and then a
single drain hose with a barbed hose connector carries
the condensate to the draining option chosen. Enough
tubing is provided to reach all drain options and can be
cut down in length.
The unit is shipped from the factory with the drain line on
the left-hand side (looking at the rear of the unit). The
tubing can be removed from the drain connections and
flipped for a right-hand drain. See Figure 10.
The drain can be routed directly through the floor or
through the wall. There are also two optional drain
locations in the lower rear back panel. See Figure 10.
The I-TEC design does not require a trap in the
condensate disposal tubing. Check local codes to see if a
"P" trap is required.
For a stand pipe floor drain or through the wall, there
is adequate hose length to reach anything located
behind the unit. The lower rear portion of the cabinet is
recessed approximately 4" allowing room for a "P" trap
to be installed with the cabinet flush with the wall. The
drain line must be able to be removed from the unit if
necessary to remove the unit from the wall.
Access plates are located on the rear of the unit for
servicing the drain trap (see Figure 10). If the drain line
is to be routed through an unconditioned space, it must
be protected from freezing.
The condensate drain line can also be routed back into the
unit through either the right-hand or left-hand optional
drain locations on the rear of the unit. The hole is
covered by insulation on the inside of the unit and will
have to be cut away. Drain holes are located inside the
unit in the bottom of the base about 12" in from the front
on both the left and right side. These holes are covered
with insulation and are not visible. They are located very
close to the side panels and can be found by pressing
down on the insulation. Cut insulation away to expose
the hole. A drain trap can now be installed inside of the
cabinet, and the drain hose routed directly through the
floor.
Once the I-TEC is installed, the rear drains exiting the
condenser section can be easily serviced with removal of
the pre-painted metal sides (lift-off doors, remove four (4)
screws to remove side).
If side access is not available, the drain lines and trap
can be serviced by removing either one of the drain
access panels on the rear of the unit (in the ventilation
package area.) See Figure 10.

WITH NO VENT OPTION

To access the drain access panels in the rear of this
section, remove the front door/cover from the box, and
the plates are located in the rear of the box.

WITH COMMERCIAL ROOM VENTILATOR

1. Open hinged front doors.
2. Disconnect unit power to eliminate shock hazard.
3. Remove front cover/door of CRV vent package.
(Can leave filter access panels in place.)
4. Unplug wires coming in on left side from upper
unit section.
5. Unplug two wire harness from front (intake) blower.
6. Remove two (2) screws securing front (intake)
blower and slide blower out of unit.
7. Remove four (4) screws that retain the partition
behind/beneath intake blower removed in Step 6.
8. Rear drain access panels are now visible on both
right-hand and left-hand sides in rear of box.

WITH ENERGY RECOVERY VENTILATOR

To access the rear drain access panels of this section:
1. Open hinged front doors.
2. Disconnect unit power to eliminate shock hazard.
3. Remove front cover/door of ERV vent package.
(Can leave filter access panels in place.)
4. Unplug wires coming in on left side from upper
unit section.
5. Unplug heat recovery cassette on the side you wish
to access, and slide cassette out the front of the
unit.
6. Remove two (2) screws securing partition on
outboard side of cassette and remove.
7. Rear drain access panels are now visible on both
right-hand and left-hand sides in rear of box.
FIGURE 10 – Drain Locations
(2) Unit Drains
Drain Access
Locations
8"
3
3
"
8
(2)OPTIONAL
DRAIN HOLES
16 1/2
OPTIONAL FLOOR
MOUNTING HOLES
3
3
"
MIS-2960 A
8
(2) Optional
Unit Drain
Entrances
WALL
7 3/16
18 3/4
35"
3
40
"
4
Manual 2100-597G