Start-up
Select Language
Set Time and Date
Filling Siphon With Water
12
Vitodens 222-F B2TB 19 and 35 Service
At the commissioning stage, the display is in German.
1. "Sprache" (Language) Deutsch DE (German)
2. Select the required language with
3. Accept by pressing OK.
To change the language
Extended menu:
1.
2. "Settings"
3. "Language"
4. Select the required language with
5. Accept by pressing OK.
Setting the time and date
During commissioning.
1. Using the
set the current time
2. Accept by pressing OK, this will move to date
3. Using the
set the current date
4. Press OK to complete
To change the time/date after prolonged time out of use.
Extended menu:
1.
2. "Settings"
3. "Time / Date"
4. Set current time and date (as shown above).
1. Pivot control unit forward.
2. Pull retaining clip A off.
3. Pull filler pipe B upwards.
4. Pull off trap C downwards.
5. Fill siphon with water and reassemble.
6. Check that the condensate pipe is connected
correctly to the siphon and heat exchanger.
7. Refit cover panel.
8. Secure control unit back in operating position.