®
WATER BOILER
Prepare boiler location
Provide minimum clearances
From combustible materials (see Figure 1)
1. Hot water pipes
(not shown in Figure 1)
2. Double-wall vent pipe
4. Boiler jacket surfaces
5. Burner cover
Combustible clearances always take pre-
cedence over service clearances.
For service access (see Figure 1)
If you do not provide the minimum
service clearances shown, it might not
be possible to service the boiler without
removing it from the space.
1. Recommended service clearances:
(door must swing fully open)
8
— Boiler Manual
Minimum clearances to combustible surfaces and
recommended minimum service clearances
Part number 550-141-986/0112