Bearing Stop Installation; Crankcase Assembly - Husqvarna TE 125 Workshop Manual

Table of Contents

Advertisement

bEARING stOp INstALLAtION

CRANkCAsE AssEmbLy

ENGINE OVERHAUL
1. Install:
• Bearing stop "1" (see fig. 106)
• Install the bearing stop "1" with the reference "OUT" "a" facing
outside.
• Apply the threadlock (LOCTITE®) on the bearing stop bolt
threadings.
7 Nm (0.7 mkg, 5.1 ft-lb)
LOCtItE®
106
1. Accurately wash all gaskets and crankcase mating surfa-
ces.
2. Apply:
• Sealant
(on crankcase mating surface)
sealant three bond No.1215®
107
• Avoid sealant from contacting oil channels.
3. Install:
• Right crankcase
• Rotate the gear selector drum section "1" to the position
shown in the figure. In this position, the gear selector drum
section teeth do not touch the crankcase during crankcase
installation.
4. Install:
• Crankcase bolts
108
10 Nm (1.0 mkg, 7.2 ft-lb)
F1.64
bearing stop bolt
Crankcase bolt
Part. N. 8000 H4704 (07-2010)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sms4

Table of Contents