Preparing For Installation - Cisco 7200 VXR router User Manual

Hide thumbs Also See for 7200 VXR router:
Table of Contents

Advertisement

Preparing for Installation

Before installing your Cisco 7200 VXR router you should consider the power and cabling
requirements that must be in place at your installation site, the equipment you need to
install the router, and the environmental conditions your installation site must meet to
maintain normal operation. This chapter guides you through the process of preparing for
your router installation.
The chapter contains the following sections:
Tools and Parts Required on page 2-1
Safety Guidelines on page 2-3
Site Requirement Guidelines on page 2-7
Initial Configuration Information on page 2-19
Cisco 7200 VXR Router Installation Checklist on page 2-20
Checking the Shipping Container Contents on page 2-22
Site Log on page 2-24
Tools and Parts Required
Your Cisco 7200 VXR chassis is fully assembled at the factory; no assembly is required.
However, you need the following tools and equipment to install the chassis and the
rack-mount and cable-management kit:
Number 2 Phillips screwdriver
A 3/16-inch flat-blade screwdriver
C H A P T E R
2
Preparing for Installation 2-1

Advertisement

Table of Contents
loading

Table of Contents