Commissioning; Electrical Installation; Gas Supply Installation; Filling The D.h.w. System - Biasi Delta User Manual And Installation Instructions

Table of Contents

Advertisement

6. Commissioning

6.1. Electrical installation

Preliminary electrical
ensure electrical safety shall be carried out by
a competent person. i.e. polarity, earth
continuity, resistance to earth and short
circuit.
If a fault has occurred on the appliance the
fault finding procedure should be followed as
specified in the service manual.

6.2. Gas supply installation

1
Inspect the entire installation including
the gas meter, test for soundness and
purge.
2
Open the gas cock 12 (
appliance and check the gas connector
on the appliance for leaks.
12

6.3. Filling the d.h.w. system

1
Close all hot water draw-off taps.
2
Open the cold water inlet cock 11 (
)
6.1
3
Slowly open each draw-off tap and
close it only when clear water, free of
bubbles, flows out.
system
checks to
) on the
Fig. 6.1
Open position
gjkj;tybt jnrhsnj
11
Fig. 6.1
6.
Ввод в эксплуатацию
6.1. Монтаж электрической части
Электрическая
предварительно
специалистами на соблюдение фазности,
устойчивости к заземлению и короткому
замыканию.
Если
устройстве,
работы, чтобы устранить их в порядке,
указанном в настоящем руководстве.
6.2. Монтаж подачи газа
1
Проверьте
включая газовый счетчик, проверьте
систему на наличие посторонних
шумов и проходимость.
2
Откройте газовый кран 12(рис. 6.1)
на
подключение на отсутствие утечек.
6.3. Заполнение системы горячей
воды
1
Закройте все краны с горячей водой.
2
Откройте
Fig.
воды 11(рис. 6.1).
3
Медленно откройте каждый кран с
горячей водой и закройте его, только
когда из него пойдет чистая, без
пузырьков вода.
система
обнаружена
неисправность
необходимо
внутреннюю
устройстве
17
18
Fig. 6.2
кран
подачи
должна
быть
проверена
в
произвести
разводку,
и
проверьте
холодной

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents