Water Treatment; 5.10 Electrical Supply - Biasi RIVA PLUS HE 24S ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Table of Contents

Advertisement

Air release points
These must be fitted at all high points where
air will natural collect and must be sited to
facilitate complete filling of the system.
Expansion vessel
The appliance has an integral sealed expan-
sion vessel to accommodate the increase of
water volume when the system is heated.
Refer to Fig. 4.4 on page 24 for its techni-
cal data.
If the heating circuit has an unusually high
water content, calculate the total expansion
and add an additional sealed expansion
vessel with adequate capacity.
Mains water feed: central heating
There must be no direct connection to the
mains water supply even through a non re-
turn valve, without the approval of the Local
Water Authority.
Filling
A method for initially filling the system and
replacing water lost during servicing must be
provided and it must comply with local water
authority regulations.
The correct method is shown in Fig. 5.4.
The temporary connection must be re-
moved immediately after filling.
Supply pipe
(cold water inlet)
C.h. return pipe
Fig. 5.4
The installer should ensure that no leaks ex-
ist either inside the boiler or on the system
as frequent filling of the system could cause
GENERAL REQUIREMENTS
Control valve
Double check valve
Temporary
connection
Control valve
premature scaling of the heat exchanger.
5.9

Water treatment

C.h. circuit
Where a new boiler is fitted to a new system
with either plastic or copper pipes, it is im-
portant the system is fully flushed, on com-
pletion, to ensure flux residues, swarfs, oils
and other installation debris is removed.
Where a new boiler is fitted to an existing
system, it is important the debris from the
existing system is fully removed in order to
ensure the efficiency of the new appliance is
maintained.
Details on flushing procedure are given in
the section "Initial filling of the system" to
page 42 of this manual.

5.10 Electrical supply

Warning, this appliance must be earthed
External wiring to the appliance must be car-
ried out by a competent person and be in ac-
cordance with the current I.E.E. Regulations
and any local regulations which apply.
Reference should be made to the current
ETCI rules for electrical installations.
For Ireland (IE), refer to I.S.813.2002.
The boiler is supplied for connection to a
230 V~ 50 Hz supply. The supply must be
fused at 3A.
The method of connection to the electric-
ity supply must facilitate complete electri-
cal isolation of the appliance by the use of
a fused spur isolation switch. Its installation
permits a complete switching off in the con-
ditions of the overvoltage category III. Alter-
natively it can be used a 3A fused three pin
plug and unswitched shuttered socket outlet
both complying with BS 1363.
The point of connection to the electricity
- 29 -
- 29 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Riva plus he 28s erp

Table of Contents