Start-Up - Weil-McLain GOLD CGt Manual

Hide thumbs Also See for GOLD CGt:
Table of Contents

Advertisement

GOLD CGt Gas-Fired Water Boiler — Boiler Manual
10b
Service and maintenance – annual start-up
Inspect . . .
Burners and base
The boiler contains ceramic fiber and
fiberglass materials. Use care when han-
dling these materials per instructions
on
comply could result in severe personal
injury.
If insulation is damaged or displaced, do
not operate the boiler. Replace or repo-
sition insulation as necessary. Failure to
replace damaged insulation can result
in a fire hazard, causing severe personal
injury, death or substantial property
damage.
1. After turning off power to the boiler, remove the base burner
shield (
Figure 37
, item
. Inspect burners and all other components in the boiler
base.
3. If burners must be cleaned see
below.
4. Inspect the slotted jacket cooling openings in the bottom left
and right of the base pan (
5. Inspect the base insulation. Pay attention to the
page 68 regarding working with insulation materials. Verify
that the insulation is intact and secure against all four sides
of the base.
Burner cleaning instructions
Airborne materials, such as fiberglass and
dust, are present during construction and
remodeling. These materials can be drawn in
with the combustion air and obstruct burner
ports, resulting in carbon monoxide produc-
tion, a fire hazard, or building freeze damage.
Read and follow the
Failure to inspect and clear gas burner ports
could result in severe personal injury, death
or substantial property damage.
1. Remove burner shield and the base pan air baffle. Next remove
the pilot bracket assembly. Then remove the four screws se-
curing the burner tray to the manifold and slide the burner
tray out under the manifold.
. Inspect each burner to insure that every port is completely
open.
Part Number 550-110-290/0107
page 68
of this manual. Failure to
4
, page 60).
Burner cleaning instructions
Figure 37
, item
7
, page 60).
WARNING
WARNING
on page 9.
3. If any port is not completely clear, run a vacuum at the burner
inlet while cleaning the burner ports with a wire brush. The
vacuum will help to draw any airborne material out of the
burner.
4. Reinstall components, starting with the burner tray, then the
pilot bracket assembly, burner baffle, and air inlet top and
front panels.
5. Follow the start-up procedure in the boiler manual.
Condensate drain system
1. Inspect condensate drain fittings and tubing. Verify that con-
densate can flow freely to drain.
Service . . .
Inducer motor
1. With boiler power
oil in each of the two oil cups.
Use only
inducer motor. Do not use universal house-
hold oils. Motor could be damaged, resulting
in possible severe property damage.
Oiled-bearing circulators
1. The circulator shipped with the CGi boiler is water-lubricated.
No oiling is required.
on
. Check other circulators in the system. Oil any circulators re-
quiring oil, following circulator manufacturer's instructions.
Over-oiling will damage the circulator.

Start-up . . .

1. Perform all start-up procedures in Section
. Verify
cold fill pressure
ing properly.
3. Verify
antifreeze level
and that inhibitor level is correct.
4.
Check gas piping
per manual Sections
indications of leakage and all piping and connections are in
good condition.
5. Read the
Operating instructions
on boiler label) applying to the boiler.
6. Start the boiler following the appropriate
Section 9c
tions
(
of this manual or on boiler label).
off
, place a few drops of S.A.E. 0 motor
S.A.E. 20 motor oil
to lubricate the
7
of this manual.
is correct and that fill system is work-
(if used) is at the right concentration
5
, and
7a
Section 9c
(
of this manual or
Operating instruc-
(cont.)
, verifying no
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents