Download Print this page

Napoleon ZCVF36 Installation Instructions Manual page 7

Zero clearance ventless firebox enclosure

Advertisement

NAILING TAB INSTRUCTION
1) Attach the nailing tabs to the corner posts using the 2
sheet metal screws supplied. Secure through the centre of
the top and bottom slots in the nailing tab and then through
the existing holes in the corner posts.
If there are no existing holes, follow these instructions:
Position the nailing tab so that the front face is offset with
the front edge of the corner post (approx. ½"). Centre the
nailing tab vertically on the corner post. (FIGURE 6a) Drill
through the centre of the top
metal screw*. (FIGURE 6c)
* Additional set screws may be installed.
MANTEL CLEARANCES
Combustible materials may be installed fl ush with the front
of the ventless fi rebox enclosure but must not cover any
of the black face-areas of the ventless fi rebox enclosure.
Non-combustible material (brick, stone or ceramic tile) may
protrude in these areas.
Combustible mantel clearance can vary according to the
mantel depth. Use the graph to help evaluate the clearance
FIGURE 7
7"MANTLE
MANTEL
6"MANTLE
MANTEL
7"
4"MANTLE
MANTEL
6"
4"
TOP OF UNIT
FIGURE 8
7
6
M H
M
5
A E
A
4
N I
N
T G
T
L H
E
E T
L
MANTLE WIDTH
MANTEL
and bottom slots in the nailing
tab. Secure using the two
sheet metal screws supplied.
This allows the nailing tab to
slide back and forth for desired
framing. (FIGURE 6b)
2)
To
determine
the
location of the nailing tab you
must fi rst determine the width
of your fi nishing material (i.e.
drywall). This will determine
the dimension from the front
edge of the corner post to the
nailing tab. Once the nailing tab
is in the desired location, drill
through the centre hole of the
nailing tab. Secure with a sheet
COMBUSTIBLE
MATERIALS
STUD
4
5 6 7
CORNER
POST
NAILING
TAB
TOP
SLOT
fi nal
FIGURE 6a
FIGURE 6c
FIGURE 6b
FINISHING MATERIAL
CENTRE HOLE
W415-0527/ 09.29.05
7

Advertisement

loading

This manual is also suitable for:

Zcvf42