Download Print this page

Napoleon EF38H Installation And Operation Instructions Manual page 6

Napoleon operation instructions electric fireplace heater ef38h

Advertisement

6
MANTEL
Depending on the width of the mantel, it may be installed
higher or lower from the top of the louvre opening. See
drawing and chart below for proper installation height of
your combustible mantel piece. Non-combustible mantels
may be installed at any height above the appliance open-
ing.
When using paint or lacquer to finish the
When using paint or lacquer to finish the
When using paint or lacquer to finish the
When using paint or lacquer to finish the
When using paint or lacquer to finish the
mantel, such paint or lacquer must be heat
mantel, such paint or lacquer must be heat
mantel, such paint or lacquer must be heat
mantel, such paint or lacquer must be heat
mantel, such paint or lacquer must be heat
resistant to prevent discolouration.
resistant to prevent discolouration.
resistant to prevent discolouration.
resistant to prevent discolouration.
resistant to prevent discolouration.
CLEARANCE TO COMBUSTIBLES
Sides......................... 0 inches
Sides................. 0 mm / 0 inches
Back.......................... 0 inches
Sides................. 0 mm / 0 inches
Floor...........................0 inches
Floor................. 0 mm / 0 inches
Top............................ 0 inches
Top
FRAMING AND FINISHING
Set the control panel front
edge flush with the finished
wall surface.
W415-0330 / B / 03.25.04
FINISHING
0 mm / 0 inches
Nailing
Tab
Installation
Sheet
Metal
Screw
1. Choose fireplace location.
2. Place fireplace in position.
3. Frame in fireplace with header across the top. It is im-
portant to allow for the finished facing materials when set-
ting the depth of the frame.
drywall) This will determine the dimension from the con-
trol panel front edge to the nailing tab. Secure with a sheet
metal screw supplied.
6. Attach the nailing tabs to the frame.
Corner Installation
Top View
Front View
Note: In order to avoid the possibility of exposed insulation
or vapour barrier coming in contact with the
fireplace body, it is recommended that the walls of the
fireplace enclosure be "finished" (ie: drywall/sheetrock), as
you would finish any other outside wall of a home. This will
ensure that clearance to combustibles is maintained within
the cavity.
4. Remove the two screws
from the sides of the fire-
place and attach the nail-
ing tabs with the screws.
5. To determine the final
location of the nailing tab,
you must first determine
the thickness of your fin-
ishing
material
(i.e.

Advertisement

loading