Mounting and commissioning the machine
8
Attaching the earthing wire / connecting the plug connections
.01.06
● Screw the earthing wires from the sewing head, the main switch and the control box to
● Insert all plug connections in the control box as designated.
8
Commissioning
.02
● Check the machine, in particular the electric leads, for any damage.
● Clean the machine thoroughly and oil it, or top up the oil ( see Chapter 11 Care and
● Have mechanics ensure that the machine's motor can be operated with the available
8
Switching the machine on/off
.03
● Switch on the machine ( see Chapter 7.01 On/off switch ).
8 - 4
Fig. 8 - 06
the stand.
Maintenance ).
electricity supply and that it is connected correctly to the terminal box. If not, do not
operate the machine under any circumstances.
Fig. 8 - 07