Attaching The Earthing Wire / Connecting The Plug Connections; Commissioning; Switching The Machine On/Off - Pfaff 3734 - 2/01 Instruction Manual

Table of Contents

Advertisement

Mounting and commissioning the machine
8

Attaching the earthing wire / connecting the plug connections

.01.06
8

Commissioning

.02
8

Switching the machine on/off

.03
8 - 4
Fig. 8 - 06
Screw the earthing wires from the sewing head, the main switch and the control box to
the stand.
Insert all plug connections in the control box as designated.
Check the machine, in particular the electric leads, for any damage.
Clean the machine thoroughly and oil it, or top up the oil ( see Chapter 11 Care and
Maintenance ).
Have mechanics ensure that the machine's motor can be operated with the available
electricity supply and that it is connected correctly to the terminal box. If not, do not
operate the machine under any circumstances.
Switch on the machine ( see Chapter 7.01 On/off switch ).
Fig. 8 - 07

Advertisement

Table of Contents
loading

Table of Contents