Sata Dom; Installing The Sata Dom Board; Preliminary Steps - Fujitsu PRIMERGY CX2550 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX2550 M1:
Table of Contents

Advertisement

9.2

SATA DOM

The server node can be equipped with a SATA DOM.
9.2.1

Installing the SATA DOM board

Upgrade and Repair Unit
(URU)
Tools: Phillips PH1 / (+) No. 1 screw driver
9.2.1.1

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 54
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 39
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 40
Ê
CX2550 M1
Upgrade and Maintenance Manual
System board and components
Hardware: 5 minutes
153

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents