Panasonic CS-E9GFEW Service Manual page 64

Hide thumbs Also See for CS-E9GFEW:
Table of Contents

Advertisement

Insulating the refrigerant piping
• Attach the pipe after checking for gas leakage, described
above.
1. Cut the insulated portion of the on-site piping,
matching it up with the connecting portion.
2. Secure the slit on the auxiliary pipe side with the butt
joint on the connection pipe using the tape, making
sure there are no gaps.
3. Wrap the slit and the butt joint with the included
insulation sheet
Caution
1. Insulate the joint of the pipes securely.
Incomplete insulation may lead to water leakage.
2. Push the pipe inside so it does not place undue force on the front grille .
11.3.6. Connecting the Indoor/Outdoor Connecting Cable
1. Leave the sensor securing plate, remove the front metal
plate cover.
2. Connecting the cable between indoor unit and outdoor
unit shall be approved polychloroprene sheathed
2
4 x 1.5 mm
flexible cord. Type designation 245 IEC57 or
heavier cord.
• Ensure the colour of wires of indoor unit and the terminal
Nos. are the same to the outdoor's respectively.
• Earth lead wire shall be longer than the other lead wires as
shown in the figure for the electrical safety in case of the
slipping out of the cord from the anchorage.
• Secure the cable onto the control board with the holder
(clamper).
, making sure there are no gaps.
64

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-e9gfeCu-e12gfeCs-e18gfewCu-e18gfeCs-e12gfew

Table of Contents