Installation Requirements; Boiler Location; Boiler Foundation - Slant/Fin SENTINEL Installation And Operating Instructions Manual

Table of Contents

Advertisement

Sentinel
Model
SE-70
SE-105
SE-140
SE-175
SE-210
SE-245
Base Assembly
Sentinel Boiler
Field Control (Effikal) Vent Damper
C
H
102mm
152mm
(4")
(6")
127mm
152mm
(5")
(6")
152mm
165mm
(6")
(6-1/2")
178mm
179mm
(7")
(7-1/16")
178mm
179mm
(7")
(7-1/16")
178mm
179mm
(7")
(7-1/16")
Burners
Pilot
Burner
Access
Door
Gas Valve
I
122mm
(4-13/16")
122mm
(4-13/16")
135mm
(5-5/16")
149mm
(5-7/8")
149mm
(5-7/8")
149mm
(5-7/8")

INSTALLATION REQUIREMENTS

IMPORTANT: This equipment must be installed in accordance with
the requirements of CSA B 149.1 latest edition for natural gas
propane. Installation Codes for Gas Burning Appliances must con-
form to requirements of the local gas company, local building
codes, and other authorities which have jurisdiction. Such require-
ments, where applicable, take precedence over these general
instructions. All electrical connections must be in accordance with
Canadian Electrical Code C22.1 Part 1.
This installation must also conform to the additional requirements
in this Slant/Fin Instruction Book.
NATURAL GAS-FIRED BOILER LOCATION
Provide a level, solid foundation for the boiler. Location should be
as near as possible to chimney or outside wall so that the flue
pipe from boiler is short and direct.
The location should also be such that the gas ignition system
components are protected from water (dripping, spraying, rain,
etc.) during appliance operation and service (circulator replace-
ment, condensate trap, control replacement, etc.).

BOILER FOUNDATION

A. Provide a solid, level foundation, capable of supporting the
weight of the boiler filled with water, and extending at least
51 mm (2") past the jacket on all sides. See dimensions of
boiler, page 2.
B. For installation on non-combustible floors only. The Com-
bustible Floor Kit part number printed on the boiler rating plate
is the only one to be used when installing on combustible
floors. The boiler must not be installed on carpeting.
C. If boiler is to be located over buried conduit containing electric
wires or telephone cables, consult local codes or the National
Board of Fire Underwriters for specific requirements.
3

Advertisement

Table of Contents
loading

Table of Contents