Assembly; Shield Installation; Nylon Line Head Installation - Echo SRM-225 Operator's Manual

Hide thumbs Also See for SRM-225:
Table of Contents

Advertisement

ASSEMBLY

ASSEMBLY

Shield Installation

(Nylon line operation)
Parts Required:
Shield with cutoff knife is for use
with the Nylon Line Head only.
Install shield without cutoff knife
when using plastic or metal
blades, or serious injury may
result.
1.
Place the shield on the bottom of
the bearing housing flange.
2.
Place shield plate (B) on shield,
align holes. Install three (3) screws
from bottom through plate and
shield into gear case.
3.
Assemble adapter plate (C) onto
PTO shaft.

Nylon Line Head Installation

Parts Required:
Wear Gloves or personal injury may result:
Cutoff knife is sharp.
Gearcase and surrounding area may be hot.
18
Debris Shield, Shield Plate,
three (3) 5 x 16 mm screws.
Nylon Line Head.
SRM-225
A
B
C
X7722279402
© 2/2016 ECHO Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents