Gas Conversion; Warnings; Procedures - Biasi M110B.24SM/C User Manual And Installation Instructions

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for M110B.24SM/C:
Table of Contents

Advertisement

8

Gas conversion

8.1

Warnings

The commissioning of this boiler and sys-
tem must only be undertaken by a pro-
fessionally qualified person in accordance
with the requirements of the Gas Safety In-
stallation and Use Regulations and be ap-
proved by C.O.R.G.I.
Components used to adapt it to the type of gas
available must be genuine parts only.
Factory setting = Natural gas
8.2

Procedures

13
Fig. 8.1
1 Check that the gas cock (13 in Fig. 8.1) fitted
under the boiler is turned off and the appliance
is switched off at the mains isolating spur.
A
Fig. 8.2
2 Remove the front panel of the case (see sec-
tion 9.2) and lower the control panel (see sec-
tion 6.9).
3 Take off the lid of the sealed chamber.
Closed position
4 Unscrew the connector A (Fig. 8.2), remove
the fixing fork B and remove the pipe C
(Fig. 8.3).
Fig. 8.3
5 Carry out the conversion for the type of gas, re-
placing the restrictors gas correctly (Fig. 8.4).
Restrictors
gas
Fig. 8.4
6 Re--- assemble the pipe gas, the front panel of
the combustion chamber and the lid of the
sealed chamber.
After any service operation on the components
of the gas circuit check all the connections for
gas leaks.
B
C
39