Standard Checks; Repair Schedule; Service Schedule - Philips Saeco Gaggia Unica RI 9933 Service Manual

Table of Contents

Advertisement

GAGGIA UNICA
6.1.

Repair schedule

Action
1
Visual inspection (transport damage)
2
Machine data check (rating plate)
3
Operational check / problem analysis
4
Opening machine
5
Visual inspection
6
Operational tests
7
Repairing the faults encountered
8
Checking any modifi cations (view info, new sw, etc.)
9
Service activities in accordance with the operating schedule
10 Internal cleaning
11 Operational test while the appliance is open
12 Assembly
13 Final inspection test
14 Draining the circuit (in winter)
15 External cleaning
16 Lubricating the brewing unit with suitable grease
17 Insulation test HG 701 (dielectric)
18 Documentation
6.2.

Service schedule

S
Replacement
ES Visual inspection
D
Descaling
Component
Water fi lter
Water tank lip seal
Boiler pin O-ring
Brewing unit
Hoses, attachments and Oetiker clamps
Pump
Gearmotor
Coffee grinder
Water circuit
Hot water/steam valve
Saeco International Group
P
Cleaning
TR
Noise test
R
Adjustment
Action
P/S
S
S
ES/P
ES
ES/TR
ES/TR
P/R
D
ES/S
Rev. 01

06 STANDARD CHECKS

Support/tool
Grease solvent / Grease
Vacuum cleaner / brush
Saeco descaler
Page
01
/ 02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents