Boiler Mounting; Boiler Mounting Frame And Bracket; Installation On Wood Studs; Installation On Metal Studs - Viessmann VITODENS 200-W Installation Instructions Manual

Series b2ha wall-mounted, gas-fired condensing boiler
Table of Contents

Advertisement

Boiler Connections

Boiler Mounting

16
Vitodens 200-W B2HA 112, 150 Installation

Boiler mounting frame and bracket

Install the boiler mounting frame to the wall studs and
floor. Ensure the mounting bracket is level.
To mount on wood or metal studs a cross bar or frame
may be required as reinforcement. The wall and studs
must be capable of supporting a minimum of 330 lb.
(150 kg).
For construction materials, use anchoring system that is
suitable for 330 lb (150 kg) loads.
CAUTION
Whichever mounting method is used, ensure that the
bracket is tightly and securely fastened to wall. Failure
to secure boiler properly could cause boiler to loosen,
posing a severe safety hazard.
IMPORTANT
When using the boiler restraint brackets, follow the
instructions supplied with the restraints prior to installing
the mounting bracket.

Installation on wood studs

Install mounting bracket on wood studs as per illustration.
Drill
3
/
" pilot holes to insert mounting bolts. Ensure that
16
holes are located in the center of each wood stud. Secure
with bolts to wooden studs as shown.

Installation on metal studs

Install mounting bracket the mounting frame as per
illustration. Drill f" pilot holes to insert anchors. Ensure
that holes are located in the center of each metal stud.
Use appropriate fasteners to mount boiler to metal studs
(not supplied). Secure with bolts to metal studs as shown.

Advertisement

Table of Contents
loading

Table of Contents