Sequence of Operation
• Thermostat calls for heat.
• Circulator turns on.
• Limit checks boiler water temperature. Burner ignition
delayed until limit determines call for heat cannot be met
by residual heat in boiler and heat distribution system.
A. See limit literature for additional information.
B. Burner delay by-passed for tankless heat call for
heat. Burner ignition begins immediately.
• Burner and circulator operation continues until
thermostat stops call for heat.
Figure 19
Boiler Controls
LIMIT
CONTROL
WIRE HARNESS
CIRCULATOR
WIRE HARNESS
BURNER
OPERATING INSTRUCTIONS
HOT
17
JACKET TOP PANEL
TEMPERATURE
PRESSURE GAUGE
UPPER FRONT
JACKET PANEL
1/4" SLOT
LOWER FRONT
JACKET PANEL
OIL BURNER
A1454