NOTE:
For
preassembled
CRRFCURB013A00), the accessory kit includes a factory-assembled,
high-static, regain transition duct. For horizontal roof (part no.
CRRFCURB012A00), a field-supplied transition duct is required.
Fig. 2 — Horizontal Supply/Return Curb and
Horizontal Adapter Details
NOTE: Part no. CRRFCURB013A00 is a fully factory preassembled
horizontal adapter which includes an insulated high static regain
transition duct and substantially improves fan static performance.
Fig. 3 — Dimensional Drawing — Horizontal
Adapter Installation
Step 3 — Field Fabricate Ductwork —
ducts to building structure. Use flexible duct connectors be-
tween unit and ducts as required. Insulate and weatherproof all
external ductwork, joints, and roof openings with counter
flashing and mastic in accordance with applicable codes.
Ducts passing through an unconditioned space must be in-
sulated and covered with a vapor barrier.
The 50HJQ units with electric heat require a 1-in. clearance
for the first 24 in. of ductwork.
Outlet grilles must not lie directly below unit discharge.
NOTE: A 90-degree elbow must be provided in the ductwork
to comply with UL (Underwriters' Laboratories) codes for use
with electric heat.
horizontal
adapter
(part
no.
Secure all
UNIT 50HJQ
014
016
DIMENSION A
UNIT 50HJQ
014
016
NOTES:
1. Dimensions in ( ) are in millimeters.
2. Refer to Table 1 for unit operating weights.
3. Remove boards at ends of unit and runners prior to rigging.
4. Rig by inserting hooks into unit base rails as shown. Use corner
post from packaging to protect coil from damage. Use bumper
boards for spreader bars.
5. Weights do not include optional EconoMi$er. See Table 1 for
EconoMi$er weight.
6. Weights given are for aluminum indoor coil plate fins and cop-
per outdoor coil plate fins. Weights of other metal combinations
are listed in Table 1.
All panels must be in place when rigging.
Fig. 4 — Rigging Details
For vertical supply and return units, tools or parts could
drop into ductwork and cause an injury. Install a 90 degree
turn in the return ductwork between the unit and the condi-
tioned space. If a 90 degree elbow cannot be installed, then
a grille of sufficient strength and density should be installed
to prevent objects from falling into the conditioned space.
Due to electric heater, supply duct will require 90 degree
elbow.
Step 4 — Make Unit Duct Connections —
shipped for through-the-bottom duct connections. Ductwork
openings are shown in Fig. 7. Field-fabricated concentric duct-
work may be connected as shown in Fig. 8 and 9.
Attach all ductwork to roof curb and roof curb basepans.
Refer to installation instructions shipped with accessory roof
curb for more information.
Step 5 — Trap Condensate Drain —
6 and 10 for drain location. Plug is provided in drain hole and
must be removed when unit is operating. One
pling is provided inside unit indoor air section for condensate
drain connection. An 8
3
2-in. x
/
-in. diameter pipe nipple are coupled to standard
4
3
/
-in. diameter elbows to provide a straight path down through
4
holes in unit base rails (see Fig. 11). A trap at least 4-in. deep
must be used.
3
MAXIMUM
SHIPPING WEIGHT
Lb
Kg
1895
860
2205
1000
Ft-in.
mm
3-1
948
3-6
1059
See Fig. 5 or
3
/
-in. half cou-
4
1
3
/
in. x
/
-in. diameter nipple and a
2
4
Unit is