Installation For Vertical Termination; Flat Ceiling Installation - Monessen Hearth HDV500NV/PV Installation And Operating Instructions Manual

Hdv series direct vent gas fireplace
Table of Contents

Advertisement

VeNtING INStAllAtIoN
The maximum angular variation allowed in the system
is 70°. Figure 31
The minimum height of the vent above the highest point
of penetration through the roof is 1' (305 mm).
1
2
3
4
Figure 31 -
Maximum Elbow Usage
INStAllAtIoN FoR VeRtICAl teRMINA-
tIoN
FP1179
1. Determine the route your vertical venting will take. If
max bends
ceiling joist, roof rafters or other framing will obstruct
the venting system, consider an offset. Refer to
Figure 32 to avoid cutting load bearing members.
Note: Pay special attention to these installation instructions
for required clearances (air space) to combustibles when
passing through ceilings, walls, roofs, enclosures, attic
rafters, etc. Do not pack air spaces with insulation. Also
note maximum vertical rise of the venting system and any
maximum horizontal offset limitations. Offsets must fall
within the parameters shown in Page 16, Figure 13.
. Set fireplace in desired location. Drop a line plumb
down from the ceiling to the position of the flue exit.
Mark the center point where the vent will penetrate the
ceiling. Drill a small locating hole a this point.
Drop a plumb line from the inside of the roof to the ceil-
ing locating hole in the ceiling. Mark the center point
where the vent will penetrate the roof. Drill a small
locating hole at this point.
56D3048
Example: Elbow 1 = 90°
Elbow  = 45°
Elbow 3 = 45°
Elbow 4 = 90°
Total Angular = 70°
Variation
1
2
3
4
FP1179
HDV Series Direct Vent Gas Fireplace
Wall Strap
FP1669
Figure 32 -
Offset with Wall Strap and 45° Elbows

FlAt CeIlING INStAllAtIoN

FP1969
1. Cut a 10Z\x" (67mm) square hole in the ceiling using
offset w/ wallstrap
the locating hole as a center point The opening should
be framed to 10Z\x" x 10Z\x" (67 x 67 mm) inside
dimensions as shown in Figure 34 using framing
lumber the same size as the ceiling joist. If the area
above the ceiling is an insulated ceiling or a room, nail
firestop from the top side. This prevents loose insula-
tion from falling into the required clearance space.
Figure 33. Otherwise, install firestop below the framed
hole. The firestop should be installed with no less than
three nails per side. Figure 33
. Assemble the desired lengths of pipe and elbows nec-
essary to reach from the burner system flue up through
the firestop. Be sure pipe and elbow connections are
fully twist-locked. Page 17, Figure 15
3. Cut a hole in the roof using the locating hole as a
center point. (Cover any exposed open vent pipes
before cutting hole in roof). The 10Z\x" x 10Z\x" (6 x
67 mm) hole must be measured on the horizontal.
Actual length may be larger depending on the pitch of
the roof. There must be a 1" minimum clearance from
the vent pipe to combustible materials. (Insulation
should be considered a combustible material) Frame
the opening as shown on Page 17, Figure 16
4. Connect a section of pipe and extend up through the
hole.
Roof Flashing
45° Elbows
Ceiling Firstop
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hdv500nvHdv500pvHdv500nscHdv500psc

Table of Contents