Installer's Guide
NOTE:
For model base size,
see table on page 7.
After installation has been completed, it is recommended that the entire system be checked against the following list:
1. Refrigerant Line, Leak checked ................................. [ ]
2. Suction Lines and Fittings properly insulated.......... [ ]
3. Have all Refrigerant Lines been secured and
isolated properly? ........................................................ [ ]
4. Have passages through masonry been sealed?
If mortar is used, prevent mortar from coming
into direct contact with copper tubing ....................... [ ]
5. Verify tightness of all electrical connects .................. [ ]
6. Observe outdoor fan during on cycle for clearance
and smooth operation ................................................. [ ]
7. Indoor coil drain line drains freely. Pour water
into drain pan .............................................................. [ ]
Trane
www.trane.com
MOUntinG hOLE LOcAtiOn
CheCkOUT PrOCeDUre
8. Supply registers and return grilles open and
9. Return air filter installed ........................................... [ ]
10. Thermostat thermometer is accurate. Check
11. Is correct speed tap being used?
12. Operate complete system in each mode to
Trane has a policy of continuous product and product data improvement and it reserves the right to change
design and specifications without notice.
note: All dimensions are
in MM (inches).
unobstructed ............................................................... [ ]
against a reliable thermometer. Adjust per
instructions with thermostat ..................................... [ ]
(Indoor blower motor) ................................................. [ ]
insure safe operation. ................................................. [ ]
From Dwg. 21D152637 Rev. 1
04/09