Installer's Guide
MOUNTING HOLE LOCATION
After installation has been completed, it is recommended that the entire system be checked against the following list:
1. Refrigerant Line, Leak checked .................................. [ ]
2. Suction Lines and Fittings properly insulated ........... [ ]
3. Have all Refrigerant Lines been secured and
isolated properly? ........................................................ [ ]
4. Have passages through masonry been sealed?
If mortar is used, prevent mortar from coming
into direct contact with copper tubing ........................ [ ]
5. Verify tightness of all electrical connects ................... [ ]
6. Observe outdoor fan during on cycle for clearance
and smooth operation .................................................. [ ]
7. Indoor coil drain line drains freely. Pour water
into drain pan .............................................................. [ ]
Trane
A business of
American Standard Companies
www.trane.com
Note: All dimensions are in MM (Inches).
CHECKOUT PROCEDURE
8. Supply registers and return grilles open and
unobstructed ................................................................ [ ]
9. Return air filter installed ............................................ [ ]
10. Thermostat thermometer is accurate. Check
against a reliable thermometer. Adjust per
instructions with thermostat ...................................... [ ]
11. Is correct speed tap being used?
(Indoor blower motor) .................................................. [ ]
12. Operate complete system in each mode to
insure safe operation. .................................................. [ ]
Trane has a policy of continuous product and product data improvement and it reserves the right to change
design and specifications without notice.
NOTE:
For model base size,
see table on page 7.
From Dwg. 21D152637 Rev. 1
P.I. 10/05