Transformer; Removal; Check The Transformer - Biasi RIVA ADVANCE HE M110B.24SM/C Service Manual

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for RIVA ADVANCE HE M110B.24SM/C:
Table of Contents

Advertisement

10

Transformer

10.1

Removal

B
Fig. 10.1
1
26
2
3
4
After reassembling ensure the wires are correctly
connected (see Fig. 10.2)
C
A
Fig. 10.2
10.2
1
2
Disconnect the four connectors A.
Unscrew the screws B and remove the
Transformer C by sliding it forward.
Reassemble the Transformer carrying out the re-
moval operations in the reverse order.
smaller
larger
connector
connector
smaller
larger
connector
connector

Check the transformer

Remove the Transformer (see section 10.1)
Measure the electrical resistance of the primary
and secondary windings.
The primary should have a resistance approx. 35
ohm and the secondary approx. 1,4 ohm.
clamp for fitting
the transformer