INSTALLATION
Refer to Figure 27. The connector (1) in the wiring
harness is for use on other appliances and does not
provide a function on this Greenstar Si Compact
Fig. 27 Unused connector
▶ Remove any packaging within the boiler and the packaging base (3).
▶ Leave the V shaped support (5) in place until the boiler is ready to be
hung on the wall frame, then remove.
5.4

PRE-PLUMBING BOILER CONNECTIONS

CAUTION:
▶ Isolate the mains gas supply before starting any work
and observe all relevant safety precautions.
▶ Be aware of plastic components when using a naked
flame on pipe work.
PLUMBING THE CONDENSATE DRAIN PIPE
▶ Fit the condensate discharge pipe as close to the wall as possible to
ensure easy fitting of the boiler bottom panel.
▶ Route the condensate pipe to an appropriate discharge point, refer to
section 4.4.
▶ Plumb up to the wall frame with 22mm pipe.
▶ Ensure that there is enough pipe to insert 25mm into the rubber hose
connector.
▶ Attach the connector to the condensate drain pipe.
25mm
Fig. 28 Condensate connection
PRV PRE-PLUMBING CONNECTION
1. Fit the PRV pre-plumbing connector to the PRV locator bracket as
shown in the figure below.
The elbow is supplied in the Hardware/Literature pack.
Do not discard the two screws in this pack.
The screws are for securing the fascia to the control
panel
26
ErP
.
1
1.
Fig. 29 PRV pipe connection
Once the wall frame has been mounted the PRV discharge pipe can be
fitted.
Fig. 30 PRV elbow fitting
▶ Connect the PRV discharge pipe to the pre-plumbing connector.
▶ The discharge pipe can be routed as required.
▶ The pre-plumbing connector must be removed before the boiler is
hung on the wall frame.
GAS AND WATER CONNECTIONS
WARNING: Bonded washer for gas (3)
▶ The bonded washer must be used on the gas pipe
isolating valve connection.
▶ Connect the system pipes using the compression nuts and olives
supplied in the Literature/Hardware pack.
1. CH flow (22mm),
2. DHW outlet (15mm),
3. Gas inlet (22mm bonded washer),
4. Domestic Cold Water inlet (15mm),
5. CH return (22mm),
▶ Fit sealing washers to service valves before hanging boiler.
1
2
3
Fig. 31 Sealing washers
Greenstar Si Compact
6720646608-111.2Wo
6720646608-125.1Wo
4
5
ErP
- 6 720 813 278 (2015/07)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30si compact

Table of Contents