Full Reline With Outside Air - Vertical - Quadra-Fire MTVI-E2-MBK Installation Manual

Mt. vernon e2 insert
Hide thumbs Also See for MTVI-E2-MBK:
Table of Contents

Advertisement

B. Full Reline With Outside Air - Vertical
NOTE: Check clearances carefully for this type of instal-
lation to ensure adequate room for outside air venting.
Figure 17.1
NOTE: In Canada this fi replace insert must be installed
with a continuous chimney liner extending from the fi re-
place insert to the top of the chimney. The chimney liner
must conform to the Class 3 requirements of CAN/ULC-
S635, Standard for Lining Systems for Existing Masonry
or Factory-Built Chimneys and Vents, or CAN/ULC-S640,
Standard for Lining Systems for New Masonry Chimneys.
August 3, 2015
12 in [305mm]
min. below
Outside Air
Termination at
Chimney Top
(Vertical)
NOTE: In Canada only a full reline is allowed per ULC
S628, ORD ULC C1482-M1990.
12 in [305mm]
min. below
NOTE: Use metal plate around
exhaust vent pipe and seal all edges
with non-flammable insulation such
as fiberglass, mineral wool or
ceramic.
Do not use high temperature
caulking materials to seal any edge
to prevent future serviceability.
Check building codes prior to installation.
• Installation MUST comply with local, regional, state and
national codes and regulations.
• Consult local building, fi re offi cials or authorities having juris-
diction about restrictions, installation inspection, and permits.
7082-131J
MT VERNON E2 INSERT
CAUTION
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtvi-e2-csbMtvi-e2-pmh

Table of Contents