Mounting And Installation; Mounting Points - Elation Color Tone 50 User Instruction

Table of Contents

Advertisement

6. MOUNTING and INSTALLATION

Cautions:
For added protection mount fixtures in areas outside walking paths, seating areas, or in
areas were a fixture might be reached by unauthorized personal.
Before mounting the fixture to any surface, make sure that the installation area can hold a
minimum point load of 10 times the device's weight.
Fixture installation must always be secured with a secondary safety attachment, such as an
appropriate safety cable (see page 12).
To avoid injury, never stand directly below the device when mounting, removing, or servicing
the fixture.

Mounting points

Overhead mounting requires extensive experience, including amongst others calculating
working load limits, a fine knowledge of the installation material being used, and periodic
safety inspection of all installation material and the fixture. If you lack these qualifications, do
not attempt the installation yourself. Improper installation can result in bodily injury.
Refer to regulations BGV C1 (formerly VBG 70) and DIN VDE0711-217
for proper installation in Europe To ensure proper installation, only
qualified staff should attempt installation.
Be sure to complete all rigging and installation procedures before connecting the main
power cord to the appropriate wall outlet.
©Elation Professional®
While choosing an installation location, please be sure that the
fixture will not be exposed to extreme heat, moisture or dust. The
minimum distance between the fixture and a wall or flat surface
should be at least .5 meter (about 1.5ft).
CAUTION!
10
Color Tone 50™
Color Tone 50™

Advertisement

Table of Contents
loading

Table of Contents