Asus P5ND2 SE User Manual page 22

Asus computer hardware user manual
Hide thumbs Also See for P5ND2 SE:
Table of Contents

Advertisement

2.
Press the load lever with your thumb (A), then move it to the left (B)
until it is released from the retention tab.
Retention tab
Load lever
To prevent damage to the socket pins, do not remove the PnP cap
unless you are installing a CPU.
3.
Lift the load lever in the direction
of the arrow to a 135º angle.
4.
Lift the load plate with your
thumb and forefinger to a 100º
angle (A), then push the PnP cap
from the load plate window to
remove (B).
5.
Position the CPU over
the socket, making sure
that the gold triangle
is on the bottom-left
corner of the socket.
The socket alignment
key should fit into the
CPU notch.
1-10
A
B
Load plate
Alignment key
CPU notch
Gold triangle mark
Chapter 1: Product introduction
PnP cap
This side of the socket
box should face you.
B
A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents