Revision History - Carrier 50YER036 Installation, Operation And Maintenance Instructions

Gt-pw water-to-water series
Table of Contents

Advertisement

W a t e r- t o - W a t e r ( 5 0 Y E R ) S e r i e s - P u r o n
R e v. : 1 J u l y, 2 0 1 0

Revision History

Date
Page #
1 July, 10
Various
20 May, 10
27 & 28
01 May, 10
30 Oct., 09
15 Sept., 09
24 June, 09
03 June, 09
03 June, 09
02 June, 09
01 June, 09
07 May, 09
29 April, 09
*97B0069N01*
The Manufacturer works continually to improve its products. As a result, the design and specifications of each product at the time for order may
be changed without notice and may not be as described herein. Please contact the Manufacturer's Customer Service Department at 1-405-
745-6000 for specific information on the current design and specifications. Statements and other information contained herein are not express
warranties and do not form the basis of any bargain between the parties, but are merely Manufacturer's opinion or commendation of its products.
The management system governing the manufacture of Manufacturer's products is ISO 9001:2000 certified.
34
Description
Warranty, Nomenclature, Unit Photos Updated
6
50YER060 & 50YER120 Physical Data Table Updated
Operating Pressures Table Updated
15
HWG Piping Drawings Revised
23
'Safety Features - CXM/DXM Controls' Section Updated
23
'Safety Features - CXM/DXM Controls' Section Updated
3
Decoder Example Updated
31
Updated Refrigeration Troubleshooting Form
15
Updated HWG Illustrations
5
Updated Cautions in the General Information Section
27
Updated Operating Pressure Heating Table
24
Unit Commissioning and Operating Conditions Updated
All
First Published
ISO 9001:2000
Certified
Quality: First & Always
97B0069N01
®
© LSB, Inc. 2009
7300 S.W. 44th Street
Oklahoma City, OK 73179
Phone: 405-745-6000
Fax: 405-745-6058
Rev.: 1 July, 2010

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50yer06050yer120

Table of Contents