GE 90*-30 PLC Series User Manual page 9

Interface between a series 90-30 programmable logic controller (plc) and a lonworks network bus interface module
Hide thumbs Also See for 90*-30 PLC Series:
Table of Contents

Advertisement

Contents
Figure 1-1. Sample L
W
Network Configuration .......................................................................... 1-2
ON
ORKS
Figure 1-2. Topology Examples ............................................................................................................... 1-4
Figure 1-3. Series 90 PLC L
W
Bus Interface Module.................................................................. 1-5
ON
ORKS
Figure 2-1. Overview of Bus Interface Module Operation......................................................................... 2-3
Figure 2-2. Bus Interface Module Powerup Sequence ............................................................................... 2-5
Figure 3-1. Module Installation................................................................................................................ 3-3
Figure 3-2. Module Removal ................................................................................................................... 3-3
Figure 3-3. Cabling for Bus and Loop Networks ...................................................................................... 3-5
Figure 3-4. Connections for LBIM Configuration..................................................................................... 3-6
Figure 3-5. Computer to L
W
Network Connections for LBIM Configuration ............................... 3-7
ON
ORKS
Figure 4-1. Example: Determining What Network Variable Types are Needed .......................................... 4-2
Figure 4-2. Example: Assigning Network Variables Types to the LBIM and PLC Registers...................... 4-3
Figure 4-3. Example: Installing the LBIM in the Network and Binding the Variables .............................. 4-23
Figure Q-1. Sample Network Configuration ............................................................................................ Q-3
Figure Q-2. Example: Identifying the Network Variables Needed to Interface with the PLC ..................... Q-8
Figure Q-3. Example: Assigning Network Variables to the Module and the PLC Registers....................... Q-9
Figure Q-4. Example: Installing the Module in the Network and Binding the Variables .......................... Q-10
GFK-1322A
Contents
ix

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents