Injection Test Setup #3 - GE 489 Instruction Manual

Generator management relay
Hide thumbs Also See for 489:
Table of Contents

Advertisement

7 TESTING
f) TEST RESULTS
TEST
Minimum Pickup
TEST
Single Infeed Fault
TEST
Slope 1
I
x
I
y
Operation
(OK/not OK)
Slope 2
I
x
I
y
Operation
(OK/not OK)
Directional
I
x
Check
I
y
Operation
(OK/not OK)
Setup the 489 device as follows for the Voltage Restrained Overcurrent test.
V C
V A
V V V V
V B
A
E10
F10
GROUND INPUTS
GE Multilin
PHASE A
CALCULATED
MEASURED
PHASE A
CT
5 × CT
PHASE A
OPERATE
RESTRAIN
N/A
N/A
N/A
3 PHASE VARIABLE AC TEST SET
B
C
N
G9
H9
G10
H10
G3
H3
G4
H4
G5
PHASE a PHASE b PHASE c
NEUTRAL END CT's
Figure 7–3: SECONDARY INJECTION TEST SETUP #3
489 Generator Management Relay
7.3 ADDITIONAL FUNCTIONAL TESTS
PHASE B
CALCULATED
MEASURED
PHASE B
CT
5 × CT
PHASE B
OPERATE
RESTRAIN
N/A
N/A
N/A

7.3.9 INJECTION TEST SETUP #3

I
I
A
B
H5
G6
H6
G7
H7
AUTOMATIC CT
SHORTING
BAR
PHASE A PHASE B PHASE C
OUTPUT CT's
PHASE C
CALCULATED
MEASURED
PHASE C
CT
5 × CT
PHASE C
OPERATE
RESTRAIN
N/A
N/A
N/A
I
I
C
N
G8
H8
G2
H1
H2
G1
PHASE
VOLTAGE INPUTS
808822A2.CDR
7-15
7

Advertisement

Table of Contents
loading

Table of Contents