Crater Repeat" Operation - Panasonic YD-500GP5 Operating Instructions Manual

Digital igbt control mig/mag power source
Table of Contents

Advertisement

Operation

9.5 "Crater repeat" operation

To repeat crater operation turn ON the torch switch within a preset time (Trep)* after turning off the previous crater
operation. (In this manner, it is possible to repeat the cra- ter operation again and again.)
*: Trep: About 2 seconds
Note:
If the torch switch is not turned on within the preset time, the function is cancelled.
● To stop welding, raise the torch until arc is cut.
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents