Electronic Carrier; Description; Dismounting Of The Electronic Assembly Group - GE eBike III basic Series Service Manual

Electric bike with and without nibp
Table of Contents

Advertisement

e
leCtronIC CarrIer
d
esCrIptIon
All electronic boards are mounted on a special metal sheet
integrated in the bottom plate of the eBike III ergometers.
This metal sheet contains a grid of holes to mount all
possible combinations of electronic boards (e.g. LIU, SMU,
BPU).
d
IsMountIng of tHe eleCtronIC asseMBly group
1. Grab the eBike at handlebar and saddle and carefully
lay it sideways on one side.
2. Remove six screws (see picture) and flip the carrier
plate carefully aside.
3. Remove the connecting cables from the corresponding
boards.
4. The PCBs are mounted on spacers, screwed from
outside of the metal sheet carrier.
5. After removing these screws, the PCBs can be
removed.
6. After replacing a board, installation is performed by
following the steps in reverse order.
- 20 -
m
etal Sheet carrier with mounting holeS
pcb
direct connector SyStem
m
etal Sheet carrier
eBike III basic / comfort
(
)
grid
,
(bpu, Smu, liu)
aSSembled
2018111-336 Rev. B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ebike iii comfort series

Table of Contents