Wall Mount Installation; Step 4: Connect The Waste Lines - GE Sievers InnovOx Operation And Maintenance Manual

On-line toc analyzer
Hide thumbs Also See for Sievers InnovOx:
Table of Contents

Advertisement

Chapter 4: Installation

Wall Mount Installation

To mount the Analyzer on a wall, consult the required clearances for the Analyzer as shown in "Appendix A:
Analyzer Dimension Diagrams."
Allow a minimum of 5 cm (2 in.) clearance between the back of the Analyzer and the wall for heat dissipation;
allow 30.5 cm (12 in.) of clearance on the sides, top and bottom of the Analyzer for the plumbing and electrical
connections. Additionally, this clearance provides for the proper circulation for temperature and humidity
control. When selecting the location, mount the Analyzer so that the display screen is approximately at eye-level.
Hardware for mounting the Analyzer on a wall or instrument rack is not included in the accessories kit.
Hardware should be selected based on site-specific circumstances. Mounting hardware must be able to support
four times the weight of the unit; thus you should install mounting bolts capable of supporting 145 kg (320 lb.).

Step 4: Connect the Waste Lines

Connect the waste line, as follows:
1.
Connect one end of the waste tube to the elbow barb labeled "Waste to Drain," as shown in Figure 5.
Figure 5: Connecting the Waste Lines
GE Analytical Instruments ©2012
71 of 238
DLM 68100-06 EN Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents