Sign In
Upload
Manuals
Brands
Will Burt Manuals
Antenna
AntennaMast AM2
Will Burt AntennaMast AM2 Manuals
Manuals and User Guides for Will Burt AntennaMast AM2. We have
2
Will Burt AntennaMast AM2 manuals available for free PDF download: Operator's Manual
Will Burt AntennaMast AM2 Operator's Manual (52 pages)
Brand:
Will Burt
| Category:
Antenna
| Size: 2 MB
Table of Contents
Table of Contents
5
Section 1 Safety Summary
8
Signal Word Definitions
8
Safety Instructions
8
Symbols
15
Section 2 Introduction
17
Intended Use
18
Definitions
18
Mast Component Descriptions
19
Figure 2-1 Telescoping Masts (Not to Scale)
19
Section 3 Technical Data
21
Payload Capacity and Wind Effects
21
Mast System Specifications
21
Table 3-1 Antennamast™ Model AM2 Specifications
22
Table 3-2 Antennamast™ Model AM2 with Lift Winch Specifications
23
Table 3-3 Antennamast™ Model AM2 with EZ RAZE Payload Elevation Systems Specifications
24
Section 4 Installation and Disassembly
25
Pre-Installation Check
25
Select a Suitable Mounting Location
25
Recommended Installation Tools
26
Unpack the Mast System
26
Table 4-1 Tools and Materials Required for Installation
26
Install the Tripod
27
Figure 4-1 Open Wheeled Bag
27
Figure 4-3 Extend Tripod Legs
27
Figure 4-4 Pull Pins Outward
27
Figure 4-6 Fully Deployed Tripod
27
Deploy the Mast
28
Figure 4-7 Stake the Tripod Legs
28
Manual Deployment
29
Figure 4-8 Different Tubes
29
Figure 4-9 Insert the Top Tube
29
Figure 4-10 One Hand Width from Bottom
29
Figure 4-11 Loosen the Pin of the 4-Way Guy Collar
29
Figure 4-12 Align Guy Stakes with the Four Holes on the Guy Collar
30
Figure 4-14 Manually Load Tubes
30
Figure 4-15 Tighten Clamps
30
Figure 4-18 Use Hammer to Drive in Stake
31
Deployment with Lift Winch
32
Figure 4-19 Different Tubes
32
Figure 4-20 Insert the Top Tube
32
Figure 4-21 One Hand Width from Bottom
32
Figure 4-22 Loosen the Pin of the 4-Way Guy Collar
32
Figure 4-23 Align Guy Stakes with the Four Holes on the Guy Collar
33
Figure 4-24 Insert Orange Barrel of the Orange Winch into the Tripod Receiver
33
Figure 4-25 Tighten the Black Knob
34
Figure 4-26 Reel out Enough Cable
34
Figure 4-27 Feed Cable through Base Plate
34
Figure 4-28 Put Ball End of Cable through the Bottom Hole
34
Figure 4-29 Thread the Cable End Back through the Top Hole
34
Figure 4-30 Pull the Slack out from the Bottom of the Key
34
Figure 4-31 Place the Key between the Leg Braces Opposite of the Orange Winch
35
Figure 4-32 after Ensuring Lift Winch Is Properly Set Up, Set Next Tube Onto the Raised Plug of the
35
Figure 4-33 Ensure Locking Tabs Fully Engage
35
Figure 4-34 One Hand Width below the Clamp
35
Figure 4-35 Lower Lifting Plate to the Ground
35
Figure 4-36 Lower Mast Tubes to the Ground
36
Figure 4-37 Stake the Base Plate
36
Figure 4-38 Use Hammer to Drive in Stake
36
Deployment with EZ RAZE
37
Figure 4-39 Different Tubes
37
Figure 4-40 Insert the EZ RAZE Top Tube
37
Figure 4-41 One Hand Width from Bottom
37
Figure 4-42 Engage the Kick Stand Lever
37
Figure 4-43 Slide EZ RAZE Top Tube down the Carriage
38
Figure 4-44 Attach Guy Lines to Top Guy Collar
38
Figure 4-45 Align Guy Stakes with the Four Holes on the Guy Collar
38
Figure 4-46 Insert the Round Key of the Blue Winch into the Tripod Reciever
38
Figure 4-47 Rotate the Carriage
39
Figure 4-48 Route the Cable between the Spool and Standoffs
39
Figure 4-49 Feed Cable through the 2 Eyelets on the EZ RAZE Carriage
39
Figure 4-50 Feed the Cable through the Top of the Top Pulley and Back down the Other Side of the
39
Figure 4-53 Feed End of Cable through the Bottom Hole in the Receiver Plate
40
Figure 4-54 Correct Installation
40
Figure 4-55 Reset the Kick Stand Lever
40
Figure 4-56 Leave Cable Loose While Deploying the Mast
41
Figure 4-58 Tighten Clamps
41
Figure 4-59 Lower Mast Tubes to the Ground
41
Figure 4-61 Use Hammer to Drive in Stake
41
Guy the Mast
42
Figure 4-62 Align Guy Stakes with the Four Holes on the Guy Collar
42
Figure 4-63 Drive Guy Stakes into the Ground at a 45° Angle Away from the Tripod
42
Figure 4-64 Clip Snap Hooks to Guy Collar
43
Figure 4-66 Tighten the Guy Lines
43
Install the Accessories
44
Payload Platform Installation
44
Guy Collar Installation
44
Figure 4-68 Attach Payload Platform to the Carriage
44
Figure 4-69 Pin the Arm in Place
44
Figure 4-70 Pin the Payload Adaptor in Place
44
Install the Payload
45
Disassemble the Mast
46
Section 5 Transportation
47
General Transportation
47
Shipping
47
Section 6 Maintenance and Disposal
49
Pre-Maintenance Check
49
Maintenance Equipment
49
Table 6-1 Equipment Recommended for Maintenance
49
Spare Parts
50
Periodic Maintenance
50
Figure 6-1 Periodic Inspections
50
Long-Term Storage
51
System Disposal
51
Advertisement
Will-Burt AntennaMast AM2 Operator's Manual (34 pages)
Manual Deploy & Deploy w/Mast Tube Lift Winch
Brand:
Will-Burt
| Category:
Antenna
| Size: 1 MB
Table of Contents
Document History
2
Grounding Instructions
32
Maintenance
33
Warranty
34
Advertisement
Related Products
Will-Burt AntennaMast AM2 with EZ RAZE
Will Burt ACCUPOINT AP-8
Will Burt ACCUPOINTAP-30
Will Burt ACCUPOINT AP-50
Will Burt Inflexion Plus 1.8
Will Burt Inflexion Plus 2.3
Will Burt Inflexion Plus 3.0
Will Burt Inflexion Plus 4.5
Will Burt Inflexion Plus 6.0
Will Burt Inflexion Plus 7.5
Will Burt Categories
Valve Positioners
Lighting Equipment
Antenna
Racks & Stands
Air Compressor
More Will Burt Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL